Alex 04/11/2012 at 8:36 AM

The short answer to what’s going on is “nothing.” We live nearby and haven’t seen work crews in a few weeks and before then it’s been pretty sporadic. They’ve opened up a hole that goes about 30-40 feet deep and now it is just sitting open (at least last I checked it was still open).

No idea what the original intent of this was.

Reply
Andrew Moore 04/11/2012 at 8:38 AM

It appears to be a monumental sewer repair project. Walk over and look down the hole – it’s at least 40 feet deep and cuts through at least two brick sewer pipes. I gotta think the project has turned out to be more complicated than originally thought.

Reply
wrs 04/11/2012 at 8:58 AM

Well, while they have that giant hole open why not bury the power lines too? Oh right. That’ll never happen.

Reply
elaine odell 04/11/2012 at 9:08 AM

hmmm, there’s an old train tunnel that runs from Jeff.Pk x Church Hill to the ravine btwn Chimborazo Pk & Libby Hill. I suspect that old tunnel has something to do with the complexity of this works project.

Reply
Observer 04/11/2012 at 9:11 AM

Thank you! I was wondering about this whole thing. They’ve also started digging in about the same area one block down in the driveway/alley by the church. I’m guessing they are connected?

Reply
UtilityBuddy 04/11/2012 at 10:42 AM

Installation of the manhole at the top of the alley. Alley between 20th and 21st closed through June. Combined sewer overflow pipe installation. This area tends to flood. http://www.richmondgov.com/PublicUtilities/projectCombinedSewerOverflow.aspx

Reply
What the Heck 04/11/2012 at 11:14 AM

It just seems as if it has been a very long time to accomplish the work. I wonder if this problem was in Fan or on Monument Ave if it would take this long ……. hummmm?

Reply
Erik 04/11/2012 at 11:36 AM

At least cancel the left arrow at the light? Waste of all westbound traffic’s time.

Reply
Bret 04/11/2012 at 12:34 PM

Erik – my thoughts exactly. If you know you are going to have a project this long, modify the traffic signal associated with it.

Reply
Human Honey Badger 04/11/2012 at 2:06 PM

It is clear from observing the citys repair projects that they dont prepare for the adequately, nor do they consider the impact of multiple ongoing or unfinished project in an neighborhood.

Take the multiple times that 2 out of 3 east west streets in shockhoe bottom are closed at the same time.

Reply
Julia H. 04/11/2012 at 2:13 PM

I own the yellow house that all this mess is in front of…the generator’s were put in front June 2009. They are repairing a sewer line that will be run through the alley down to 20th St. In my opinion, the city did not evaluate the infrastructure required to facilitate the new condos completed on East Broad from 21st to 20th St. Some may recall that they actually hit a line that had gas running through it and had to evacuate the entire block including the kids at the Montessori School. They had to dig at least 30 feet down to remove a granite “line” and this was the big problem initially.I would not doubt that they have run into additional problems. I will glad when the work is complete!

Reply
Julia H. 04/11/2012 at 2:21 PM

PS…I think the combined sewer explanation from the City is bologna!

Reply
RKM 04/11/2012 at 2:28 PM

I was starting to wounder if I was the only one that noticed that days and weeks went by with no activity at this work site.

Reply
Sally 04/11/2012 at 2:30 PM

Come check it out on Thursday and stop by Tricycle Gardens for your local produce, plant starts and a tour of our new greenhouse!

Reply
Steven 04/11/2012 at 4:41 PM

Can they dig a 40ft. hole at the Blue Wheeler? Just saying. One can dream.

Reply
Billy B 04/11/2012 at 6:20 PM

I’m surprised they haven’t just put a metal plate over it and called it done. That seems to be the most common way of fixing the roads in downtown Richmond, lol.

Reply
BAC 04/11/2012 at 8:35 PM

Julia H., I feel for you. I often wondered how the person in the yellow house felt about those LOUD generators being there for almost 3 years now. I don’t think I could be as patient. My guess is once the contractor began the project they realized it’d be much more complicated, and maybe even asked for more money from the city….something I’m sure takes a while to get approved.

Reply
just a neighbor 04/13/2012 at 10:09 PM

I’ve actually seen them working daily on my way to work. They are currently working in the ally and this has closed the drive way from both ends in to the Montessori school. .

Reply
Lora 04/16/2012 at 10:52 AM

@9, I think they’ve done away with the left turn arrow eastbound on Broad-at least that’s how it appeared over the weekend.

Reply